Temporary Hospital
Overview
TSG collaborated on a bespoke, temporary structure project with one of the UK’s largest healthcare specialists, BUPA.
The Structure Group was approached by BUPA to design and install a temporary unit with a built in cafeteria area. The idea was for this to be built next to one of their main offices and stay in position until the refurbishing works inside were complete. It was because of this that BUPA initially made contact with TSG as this is where the Heavy Deck solution comes in to its own with a rapid installation time. A similar challenge which was tried and tested when TSG installed temporary retail stores for Tesco.
Scope
10m x 30m
Utilising the key benefits of Heavy Deck.
TSG were happy to help and offered a full turnkey solution by utilising the key benefits of Heavy Deck. The deck created the level surface for the build, incorporating a 10m x 30m modified A-frame structure with a bespoke cladding system. The cladding system not only offered an excellent thermal value to the temporary building but also allowed the project to visually blend into its surroundings which was very important to the client as the project was to operate on a twelve month hire.
Finally a separate, prefabricated and fully installed and functioning kitchen unit was then contracted and built within the temporary A-frame structure to create the seamless connection between kitchen and cafeteria space.
Outcome
Project Implementation and Structural Expertise
TSG has since continued to deliver a range of bespoke, temporary structures for a number of clientele and had also seen huge developments within the product and the company.