Project Description

Epsom Racecourse | Investec Derby Day

‘Elevated, clear views around the track’


Date: 11th of June 2014

Since 2011 The Structure Group has been extremely proud to be a part of the Derby Day held at Epsom Downs Racecourse.

Each year TSG has used its HeavyDeck system to utilize the difficult terrain below and create an elevated surface more than 3m in the air in order to house a 25m x 50m marquee structure including an outdoor 250m2 balcony area and offering the race goers pillar-less views unlike anywhere else at the racecourse, across the grounds right through from the starting post to the finishing line.

TSG delivers a rapid installation time with extremely competitive pricing year in year out allowing the Epsom Downs Racecourse to increase its capacity temporarily and offer all a great day out.

 

For more information on the day itself check out the Epsom Downs site – Click here

Or if you’d like to get in touch with us, please call us or – Click here


Down Memory Lane | The Investec Derby Festival at Epsom DownsRacecourse