TSG would love to hear from you so to get in touch please give us a ring on the number above or - Click here

Project Description

Temporary Ice Rinks with TSG’s Cassette Deck

‘Light-weight decking system that adapts to the worst of conditions with TSG legs’


Date: 10th of September2014

 

 

TSG’s cassette system offers a lightweight decking solution (up to 10kN/m2) that works on the same self-levelling leg system as the HeavyDeck solution and can negate the use of any standard scaffolding. The system is extremely fast to install, hand built and excellent for busy city centres and other locations that have restricted access.

The cassette deck system comes in 1m x 2m boards and can easily be installed by a small team of operatives. The use of TSG’s self levelling leg system then reduces the install time significantly and allows full access under the deck. This can be very useful for the production side of things and can also help with the likes of storage or merchandising dependant on the location and design. As well as the reduction in time speak laying out the deck, TSG’s leg system can be built up to 4m high something that scaffolding will very much struggle with.

The cassette deck system has been used extensively by TSG on a vast number of sites within the seasonal / temporary ice rink industry for over 10 years’ now. During this time TSG has faced and overcome a number of challenges and has developed a range of skills. Our logistics team, project managers and operatives have been with us all the way and can offer a resolution for any potnetial problem.

 

Previous experience:

Bristol

Cribbs Causeway
Halifax
Hastings
Lapland UK
Nottingham
Sandy Balls
Wembley Stadium
Windsor

 

TSG would love to hear from you so to get in touch and find out some more about the system or to see how we can help please give us a ring on the number above or – Click here

 


 

Gallery: